Goldstar Announces Non-Brokered Private Placement, Completes Permitting, Prepares for Diamond Drilling

[ad_1]

NOT FOR DISTRIBUTION IN THE UNITED STATES OR TO U.S. NEWSWIRE SERVICES

MONTREAL, May 12, 2021 (GLOBE NEWSWIRE) — Goldstar Minerals Inc. (“Goldstar” or the “Corporation”) (TSX-V: GDM) is pleased to announce a non-brokered private placement of flow-through shares of up to a maximum of $720,000. Furthermore, Goldstar announces that the permitting is now complete with respect to the upcoming drilling program on its Anctil property, located in Québec, Canada and that it has secured a drilling contractor to carry out the program.

Private Placement

The non-brokered private placement will consist of a maximum of 4,000,000 flow-through common shares (“Flow-Through Shares”) to be issued at a price of $0.18. The maximum gross proceeds to be raised under this private placement offering (the “Offering”) is $720,000.

See also  Variant first detected in India is forcing the UK to rethink its approach

Each Flow-Through Share will consist of one common share of the Corporation to be issued as a “flow-through share” as defined in the Income Tax Act (Canada).

The proceeds from the issuance of the Flow-Through Shares will be used to incur Canadian Exploration Expenses on properties of the Corporation located in the Province of Québec.

In respect of subscriptions sourced by an eligible finder (“Finder”), the Corporation will issue to the Finder common shares equal to 8% of the number of Flow-Through Shares subscribed.

Closing of the Offering is subject to all applicable regulatory approvals, including the approval of the TSX Venture Exchange (the “Exchange”).

All securities to be issued pursuant to the Offering will be subject to a four month hold period commencing on the Closing Date, in accordance with applicable Canadian securities laws, in addition to any other restrictions applicable under the policies of the Exchange.

See also  Govt pro-actively looking for action on WhatsApp privacy rules issue: MeitY official

Permitting

The Corporation has completed permitting on its Anctil property. Goldstar expects to begin its first phase diamond drilling program in late May or early June. The upcoming drilling program is intended to investigate the new target area of approximately 1 kilometre long by 0.8 kilometre wide south of Anctil Lake identified during the Fall 2020 prospecting campaign. This target area, where almost no drilling was performed in the past, is open both to the west and the east.

Historical drilling done in 1987 by Argentex Resource Exploration Corp., returned in hole LA-87-6 values of up to 3.5 g/t Au over 0.9 m between 101.6 and 102.5 m and up to 36.1 g/t Au over 0.9 m from 127.9 to 128.8 m in the surrounding host rocks consisting of mafic and felsic volcanic rocks, less than 25 metres away from the altered tonalite and host rocks contact. The hole LA-87-6 is reported to have a total length of 134 m and is believed to have tested the northern edge of the new target area that extends a few hundred metres to the south.

See also  Popular justice chief stands against reformers in Iranian presidential election

The Corporation cautions that these gold values are historical in nature and, thus, not NI 43-101 compliant. In addition, these values may not be representative of the mineralization that may be present on the property.

Diamond Drilling

The upcoming diamond drilling program will consist of between 10 to 12 holes totalling 2,500 metres. Goldstar is currently in the process of preparing the sites for drilling access.

David Crevier, CEO comments “Goldstar is very pleased to be undertaking its first phase drilling program on the Anctil property. The newly interpreted northeast structure opens up the considerable potential of this target. This drilling campaign will provide new information to further our understanding of the potential at Anctil.”

See also  ADVANTAGES OF FOREX CARDS AND THEIR BENEFITS FOR TRAVELERS

Disclosure

The technical information contained in this news release has been reviewed and approved by Benoit Moreau, P.Eng., a consultant of the Corporation. Mr. Moreau is a qualified person as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects.

For further information, please contact:

David Crevier
Chairman
Telephone: 514-284-3663
dcrevier@goldstarminerals.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statement or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Primary Logo

[ad_2]

Source link

See also  The digital detectives searching for North Korea’s disappeared

Latest

An Insight Into Supply Chain Management Course At IIM Raipur

IIM Raipur offers a program called IIM Raipur Supply chain management course that is a program that teaches students the fundamentals and best practices...

Tips Playing Online Slot Games from Pragmatic Play

Whether you're a newcomer to slot online gaming or a seasoned veteran, knowing what to look for in the slots you play can improve...

How to Choose Baby Bottles to Prevent Gas and Colic Prevention?

How do you choose the right baby bottles to prevent Gas and Colic Prevention? feeding a child suffering from a gas can be a stressful and emotional experience for both the child as well as the parent.

5 Quick Tips for Improving Your Hiring Process

Hiring the right talent is a challenge for small business owners, with 63.4% reporting it as their biggest obstacle to running their businesses successfully. Are you...

BIM for Structural Engineering

Building Information Modelling (BIM) allows structural engineers to design, analyse, visualise, simulate, and record projects. Structural Engineers may digitally create the building structure using...